中文版

Project

To be continued…

► U/W hull CCTV inspection for a 333-meter oil tanker at No.13 ZH Anchorage, China on August 5th.

► Carried out U/W bow thruster propeller blades cutting/grinding for a 369-meter container vessel at Yantian Port, China on August 4th.

► Carried out sensors installation / replacement for Becker PBCF of container vessel at Yantian Port in August.

► Carried out U/W propeller polishing for a 368-meter container vessel at Yantian Port, China on June 13rd.

► U/W hull cleaning for a 347-meter container vessel at Chiwan Port, China on March 27th.

► Carried out U/W plugging overboard valve for a 218-meter bulk carrier at Rizhao Port, China on December 26th.

► Rope guard installation by U/W welding for a 294-meter container vessel at Chiwan Port, China on October 20th.

► Carried out repair of bow thruster tunnel corroded for a 294-meter container vessel at Chiwan Port, China on September 28th.

► UWILD and propeller polishing for a 292-meter bulk carrier at Fangchen Port, China on March 22nd.

► Carried out UWILD (DNV-GL) for a 190-meter bulk carrier at Dongfang Port, China on December 16th.

Class Available: ABS / BV / DNV-GL / LR / NK / KR/ CCS